Data Centre Construction in London

Richmond Traders provides data centre construction and fit-out services for businesses in Richmond, South West London and across London. From a single server room or comms room to a full data hall refurbishment, we deliver secure, resilient spaces built around the needs of your IT infrastructure.
Data centre construction at a glance
- Who we are: Richmond Traders, a South West London construction company delivering commercial and technical building projects.
- What we build: data centres, server rooms, comms rooms, data halls, edge and micro data centres, and colocation suite fit-outs.
- Where we work: Richmond, Twickenham, Kingston, Hampton, Isleworth, Teddington, Kew, Barnes, Sheen, Ealing and across London.
- How we deliver: one contractor from site survey and design to construction, testing and handover.
Our data centre building services
- Server room and comms room construction: new-build and refurbished rooms for on-site IT equipment.
- Data hall fit-out: raised access floors, suspended ceilings, partitions and fire-rated walls.
- Power and electrical works: distribution, lighting and containment, delivered with our qualified electricians and specialist partners.
- Cooling and airflow: builders’ works for air conditioning, hot and cold aisle containment and ventilation.
- Fire protection and security: fire stopping, secure doors, access control and CCTV provision.
- Structural and civil works: floor strengthening, plant bases, cable routes and external works.
Why choose Richmond Traders for data centre construction?
- One contractor: design and build delivery, coordinating builders, electricians and M&E specialists.
- Minimal disruption: phased programmes and out-of-hours working to keep your business running.
- Safety first: full RAMS, health and safety management and clean, controlled sites.
- Commercial experience: see our commercial construction services and office refurbishment work.
How a data centre project works
- 1. Site survey and brief: we assess the building, power, cooling and access requirements.
- 2. Design and planning: layouts, specifications and any planning or building control approvals.
- 3. Clear quotation and programme: itemised costs and a realistic timeline.
- 4. Construction and fit-out: managed by a dedicated project manager.
- 5. Testing and handover: inspections, certificates and documentation.
Types of data centre projects we deliver
On-premises server rooms
Many London businesses still need on-site IT. We convert offices, storerooms and basements into secure server rooms with fire-rated walls, dedicated power, cooling and cable management, sized for the equipment you have today and the growth you expect.
Comms rooms and network hubs
Comms rooms keep your network, telephony and security systems running. We build clean, well-ventilated rooms with structured cabling routes, secure access and enough space for racks, patch panels and future upgrades.
Edge and micro data centres
Edge facilities place computing power close to where data is used. We prepare the space, plinths, power and cooling for modular and containerised data centre units on commercial and industrial sites.
Data hall refurbishment and upgrades
Older data halls often struggle with heat, power capacity and space. We strip out and refit raised floors, ceilings, containment and fire protection, and we can phase the work so live equipment keeps running.
Colocation suite fit-out
For colocation providers and their tenants, we fit out cages, suites and private rooms with partitions, secure doors, access control, lighting and cable containment to the provider’s specification.
Built to recognised UK standards
Data centres must be safe, compliant and reliable. Our teams and specialist partners work to the standards that apply to each project, including:
- BS 7671 (IET Wiring Regulations) for all electrical installation, testing and certification.
- Building Regulations, including Part B (fire safety) and Part L (energy efficiency), with building control sign-off where required.
- Fire stopping and compartmentation using tested products, so fire-rated walls, floors and service penetrations perform as designed.
- Data centre design principles such as BS EN 50600 where the client’s specification requires them.
- Health and safety through full RAMS, CDM duties and controlled, clean working practices.
Energy-efficient and future-ready data centres
Power and cooling are the biggest running costs in any data centre. We help reduce them from day one with hot and cold aisle containment, sealed raised floors, efficient LED lighting, well-planned airflow and spare capacity in containment and power routes, so your facility can grow without major rebuilding work.
What affects the cost of a data centre build?
Every project is different, so we price each one after a site survey. The main factors are:
- The size of the room and the number and density of racks.
- The level of resilience required, for example N, N+1 or 2N power and cooling.
- The cooling method, from comfort-style air conditioning to precision cooling.
- The condition of the existing building and any structural or floor-strengthening work.
- Power supply upgrades, UPS and generator provision.
- Fire detection and suppression systems.
- Working hours, including phased, night or weekend works in live environments.
You receive a clear, itemised quotation and a realistic programme, so you know exactly what is included before work starts. Request a quote to get started.
Areas we cover
We deliver data centre, server room and commercial construction projects across London and South West London, including Richmond, Twickenham, Isleworth, Hampton, Kingston, Ham and Petersham, Sheen, Barnes, Kew, Teddington and Ealing.
Frequently asked questions
Can you build a server room inside an existing office?
Yes. We regularly adapt existing commercial spaces, adding fire-rated walls, secure doors, dedicated power, cooling and cable management.
Do you work out of hours?
Yes. We can plan noisy or disruptive works for evenings and weekends to avoid affecting your business operations.
Do you handle electrical and cooling works?
We coordinate all trades, including electrical, cooling and fire protection, so you have one point of contact for the whole project.
How long does it take to build a server room?
It depends on the size and complexity. A small server room or comms room refurbishment may take a few weeks, while a full data hall fit-out can take several months. We give you a detailed programme with your quotation.
Can you work inside a live data centre?
Yes. We plan work in phases, use permits to work, control dust and vibration, and schedule high-risk tasks out of hours so live equipment stays protected.
What resilience level does my data centre need?
It depends on how critical your systems are. N+1 adds one spare unit of power or cooling, while 2N fully duplicates them. We help you choose the right level for your budget and risk.
Do you provide RAMS and certificates?
Yes. We provide risk assessments and method statements (RAMS) before work starts, and electrical certificates, test results and handover documentation at completion.
Start your data centre project
Planning a new server room, comms room or data centre fit-out? Contact Richmond Traders to arrange a site survey and a clear, itemised quote.
